A complete guide to steel fixing techniques

What is Steel Fixing?

Steel fixing involves placing and securing steel bars (known as rebar) in concrete structures to provide tensile strength. Without steel, concrete is strong in compression but weak in tension. Steel fixing helps bridge that gap—literally.

Key roles include:

Ensuring the correct spacing and cover

Measuring and cutting rebar

Placing it according to design specs

Tying or welding bars together

Get in touch with Mankach Steel for all your Steel supply,cutting,bending and steelfixing . Our contact number: +263 77 221 5738

Why steel fixing is critical in construction?

Reinforced concrete is used in:

  • Foundations
  • Slabs
  • Beams and columns
  • Bridges and tunnels

Proper steel fixing ensures:

  • Structural strength
  • Durability over time
  • Resistance to seismic and load stress
  • Compliance with engineering codes

Incorrect fixing can cause cracks, deflection, or total failure of structures.

Tools and equipment required

Here’s a table with essential tools every steel fixer needs:

ToolPurpose
Nips (Tie Wire Pliers)Twisting tie wire
Measuring TapeAccurate bar length
Rebar CutterCut steel to size
Bending MachineShape bars precisely
Spirit LevelMaintain alignment
Chalk LineMarking placement
PPE (gloves, goggles, boots)Safety gear

The above tools and equipement ensure safety of the tradesmen.

Common types of reinforcing steel (Rebar)

Know your steel—each type serves a purpose.

  • Mild Steel Bars: Smooth surface, limited grip
  • Deformed Bars: Ridges for improved bonding
  • TMT Bars (Thermo-Mechanically Treated): High strength and flexibility
  • Welded Wire Mesh: Prefabricated for slabs and walls

Bars come in diameters from 6mm to 50mm, and lengths of 12m are standard.

Understanding steel fixing drawings and schedules

Before you lift a bar, study the plan. Steel fixers must read:

  • Bar Bending Schedules (BBS): Show bar shapes, lengths, and bends
  • Structural Drawings: Indicate placement, spacing, and anchorage
  • Elevation and Sectional Views: Help visualize placement in 3D

Mistakes in interpretation can lead to major on-site issues—never skip this step.

Site preparation before steel fixing

Start with a clean, ready foundation.

  • Remove debris, dirt, or water
  • Set out formwork precisely
  • Place cover blocks to ensure spacing from form edges
  • Mark bar placements using chalk lines or paint

This groundwork ensures bars are placed where they’re meant to be.

Techniques for Cutting and Bending Rebar

Bars must match the drawings exactly.

Cutting:

  • Manual cutter for small jobs
  • Hydraulic cutter for large volumes

Bending:

  • Use a bar bender or machine
  • Bends are typically 45°, 90°, or 135°
  • Avoid sharp bends which can weaken the bar

Follow the bending schedule to the millimeter for structural accuracy.

Lapping and Anchoring Methods

When a single bar isn’t long enough, it’s lapped (overlapped with another bar).

  • Lap Length: Usually 40x the bar diameter (e.g., 800mm for 20mm bar)
  • Anchoring: Ensures the bar resists being pulled out; often hooked or bent

Incorrect lapping can result in bar slippage—always measure and tie securely.

Correct Tying Methods: Hand vs Mechanical

Hand Tying:

  • Tie wire twisted with nips
  • Figure-8, saddle, or cross ties are common

Mechanical Tying:

  • Fast and consistent using powered guns
  • Best for high-volume or commercial jobs

Use the right gauge wire (1.2mm – 1.6mm) and ensure all joints are snug.

Spacing, Cover, and Alignment Best Practices

Structural integrity depends on precise layout:

  • Spacing: As per drawing, affects load distribution
  • Cover: Concrete cover prevents rust—usually 25mm–75mm
  • Alignment: Misaligned bars = compromised strength

Use spacers and bar chairs to maintain position during concrete pouring.

Fixing Rebar for Footings and Slabs

Footings:

  • Place bottom mat first, then verticals (if needed)
  • Ensure corner overlaps are well tied

Slabs:

  • Lay mesh or bars in a grid pattern
  • Maintain elevation with slab chairs
  • Allow bar laps over supports

Check frequently to ensure positioning before concrete is poured.

Fixing Rebar for Columns and Beams

Columns:

  • Vertical bars (main) plus lateral ties (stirrups)
  • Use templates to keep spacing accurate

Beams:

  • Bottom bars placed first, then stirrups, then top bars
  • Ensure anchorage into adjacent columns

Secure every intersection and double-check measurements. Please ensure you choose the right type of steel.

Health and Safety in Steel Fixing

Steel fixing involves sharp tools, heavy materials, and repetitive strain.

Safety tips:

  • Wear steel-toed boots and gloves
  • Use back support or lifting tools
  • Never climb on rebar cages
  • Follow site-specific safety protocols

A tidy site is a safe site—clean as you go.

Quality Checks and Inspections

Before concrete is poured:

  • Check all ties are secure
  • Confirm spacing and cover with a ruler
  • Inspect bends and laps for accuracy
  • Ensure formwork is tight and aligned

Keep records and photos—especially for critical load areas.

Frequently Asked Question and Answers

1. What is the minimum lap length for rebar?
Typically 40 times the diameter of the bar, but it varies by design code.

2. Can I reuse rusted rebar?
Light surface rust is acceptable, but flaking or pitting rust is not.

3. Is welding rebar better than tying?
Welding offers strength but is more expensive and requires clean conditions.

4. How do I ensure the correct concrete cover?
Use concrete or plastic spacers (“cover blocks”) as per design.

5. What happens if rebar is misaligned?
It can compromise the load-bearing design and fail inspection.

6. Is there a certification for steel fixing?
Yes. Many countries offer trade qualifications or certifications for steel fixers.